Doordarshan Kendra metro station

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Doordarshan Kendra
Ahmedabad Metro station
Doordarshan Kendra metro station.jpg
LocationSunrise Park, Gurukul, Ahmedabad, Gujarat 380052
Coordinates23°02′53″N 72°31′28″E / 23.04817°N 72.52447°E / 23.04817; 72.52447Coordinates: 23°02′53″N 72°31′28″E / 23.04817°N 72.52447°E / 23.04817; 72.52447
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Vastral Gam
Platform-2 → Thaltej
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Disabled accessYes Disabled access
Other information
StatusOperational
History
Opening30 September 2022; 16 months ago (30 September 2022)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Ahmedabad Metro' not found.
Location
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).

Doordarshan Kendra is an elevated metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. It was opened to the public on 30 September 2022.[1][2][3][4]

Station Layout[edit]

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Doordarshan Kendra track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Vastram Gam next station is Gurukul Road
Platform 2
Westbound
Towards ← Thaltej
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit[edit]

See also[edit]

References[edit]

  1. "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
  2. www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
  3. "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  4. "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.

External links[edit]

Template:Ahmedabad Metro navbox