Kurar metro station
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.
Thank you for being part of the Bharatpedia family! 0% transparency: ₹0 raised out of ₹100,000 (0 supporter) |
Kurar | |||||
---|---|---|---|---|---|
Mumbai Metro station | |||||
Location | Malad, Ambewadi, Malad East, Mumbai, Maharashtra 400097 | ||||
Coordinates | 19°11′14″N 72°51′31″E / 19.18726°N 72.85848°ECoordinates: 19°11′14″N 72°51′31″E / 19.18726°N 72.85848°E | ||||
Owned by | Mumbai Metropolitan Region Development Authority (MMRDA) | ||||
Operated by | Mumbai Metro One Pvt Ltd (MMOPL) | ||||
Line(s) | Template:Rcb | ||||
Platforms | Side platform Platform-1 → Template:Stl Platform-2 → Template:Stl | ||||
Tracks | 2 | ||||
Construction | |||||
Structure type | Elevated | ||||
Platform levels | 2 | ||||
Parking | No | ||||
Disabled access | Yes | ||||
History | |||||
Opened | 2 April 2022 | ||||
Electrified | 25 kV 50 Hz AC through overhead catenary | ||||
Services | |||||
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Mumbai Metro' not found. | |||||
| |||||
Location | |||||
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value). |
Kurar is an elevated metro station on the Red Line 7 of Mumbai Metro in Mumbai, India. This metro station was inaugurated on 2 April 2022 by Prime Minister Narendra Modi. [1][2][3]
Station Layout[edit]
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Northbound |
Towards → Ovari Pada next station is Akurli | |
Platform 1 Southbound |
Towards ← Gundavali next station is Dindoshi | |
Side platform | Doors will open on the left | ||
L2 |
Power and Signaling System[edit]
Like all other stations and railways of Mumbai metro, Kurar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
Entry/Exits[edit]
This section is empty. You can help by adding to it. (August 2023) |
See also[edit]
References[edit]
- ↑ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 8 August 2023.
- ↑ "PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra". WION. Retrieved 8 August 2023.
- ↑ "PM Modi inaugurates two new Mumbai Metro lines, launches other development projects". The Hindu. 19 January 2023. ISSN 0971-751X. Retrieved 8 August 2023.
External links[edit]
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.